Organisation Chain TNEB Limited||TANGEDCO||CE-MTPS-II - TANGEDCO||SE-Civil-MTPS-II - TANGEDCO
Tender Reference Number CE/MTPS II/SE/Civil/OT.No. 78 /2023 -2024.
Tender ID 2024_EB_416823_1 Withdrawal Allowed No
Tender Type Open Tender Form Of Contract Works
Tender Category Works No. of Covers 2
General Technical Evaluation Allowed No ItemWise Technical Evaluation Allowed No
Payment Mode Online Is Multi Currency Allowed For BOQ No
Is Multi Currency Allowed For Fee No Allow Two Stage Bidding No
Online Bankers
S.No Bank Name
1 SBI Bank
Cover No Cover Type Description Document Type
1 Fee/PreQual/Technical EMD, Tender Specification, Other Documents, BQR .pdf
2 Finance Price bid .xls
Tender Fee in ₹ 0.00
Fee Payable To Nil Fee Payable At Nil
Tender Fee Exemption Allowed No
EMD Amount in ₹ 9,200 EMD Exemption Allowed Yes
EMD Fee Type fixed EMD Percentage NA
EMD Payable To Nil EMD Payable At Nil
Title OT-78
Work Description Construction of new RCC sump at a point near Primary Crusher storm water drain to control the flow of ash into surplus course through the storm water drains of MTPS II.
NDA/Pre Qualification Tender Specification
Independent External Monitor/Remarks NA
Tender Value in ₹ NA Product Category Civil Works Sub category NA
Contract Type Tender Bid Validity(Days) 90 Period Of Work(Days) 120
Location MTPS-II- Mettur Dam Pincode 636406 Pre Bid Meeting Place NA
Pre Bid Meeting Address NA Pre Bid Meeting Date NA Bid Opening Place SE/Civil/MTPS-II
Should Allow NDA Tender No Allow Preferential Bidder No
Enable Media Publish Date NoEnable Tender Bulletin Date No
Published Date 01-Feb-2024 03:00 PM Bid Opening Date 16-Feb-2024 02:30 PM
Document Download / Sale Start Date 01-Feb-2024 03:00 PM Document Download / Sale End Date 15-Feb-2024 02:00 PM
Clarification Start Date NA Clarification End Date NA
Bid Submission Start Date 01-Feb-2024 03:00 PM Bid Submission End Date 15-Feb-2024 02:00 PM
NIT Document
S.No Document Name Description Document Size (in KB)
1 Tendernotice_1.pdf Construction of new RCC sump at a point near Primary Crusher storm water drain to control the flow of ash into surplus course through the storm water drains of MTPS II. 532.40
Download as zip file
Work Item Documents
S.No Document Type Document Name Description Document Size (in KB)
1 BOQ BOQ_495800.xls Digital Signature Price bid 258.00
Name SE/Civil/MTPS-II
Address SE/Civil/MTPS-II