Procurement Summary
Tender ID- 100136 View BOQ/Item Details
Organization Name | Gujarat State Police Housing Corporation Ltd |
Location | Junagadh |
Department | Gujarat State Police Housing Corporation Ltd |
Sub Department | Junagadh Division |
IFB/Tender Notice No | 13 [2024-2025] |
Tender Type | Open |
Tender title/Name Of Project | Construction of RSI Office, Kot Room and Mounted Unit at Inaj Police Head Quarter, Dist. Gir Somnath. [Including Electrical Works] [Two Cover Bid] |
Description of Material/Name of Work | Construction of RSI Office, Kot Room and Mounted Unit at Inaj Police Head Quarter, Dist. Gir Somnath. [Including Electrical Works] [Two Cover Bid] |
Sector Category | State Governments & UT |
Form of Contract | Works |
Product Category | Civil - All |
Tender Category | WORKS |
Estimated Cost Value | 90812136.24 INR. () |
Is ECV Visible to Supplier? | Yes |
Tender Currency Type | Single |
Tender Currency Setting | Indian Rupee |
Period of Completion/Delivery Period | 16 Months |
Procurement Type | Works |
Consortium / Joint Venture | N/A |
Rebate | N/A |
Alternate decrypter | N/A |
Calender Details
Bid Document Download Start Date | 23-08-2024 16:00 |
Bid document download End Date | 12-09-2024 18:00 |
Bid Submission Start Date | 23-08-2024 16:00 |
Bid Submission Closing Date | 12-09-2024 18:00 |
Tender NIT View Date | N/A |
Remarks | Bidder Shall have to Submit EMD (Earnest Money Deposit for 180 Days Validity) in the form of Fixed Deposit Receipt, Tender Fee in the form of Demand Draft (Non Refundable), Affidavit in Physical form as mentioned in Notice Inviting Tender (Please refer Detailed NIT on (www.gsphc.gujarat.gov.in) on or Before 18-09-24 at 18:00 Hrs at the Gujarat State Police Housing Corporation Ltd, B/hLokayukt Bhavan, Sector 10 /B, Gandhinagar |
Pre-Bid Meeting | No Meeting |
Bid validity | 120 Days |
Amount Details
Bidding Processing Fee ( OFFLINE) | 12,000 INR. () |
Bidding Processing Fee Payable to | Gujart State Police Housing Corporation Ltd, |
Bidding Processing Fee Payable at | Junagadh |
Bid Security/EMD/Proposal Security INR ( OFFLINE) | 908,122 INR. () |
Bid Security/EMD/Proposal Security INR Payable to | Gujart State Police Housing Corporation Ltd, |
Bid Security/EMD/Proposal Security INR Payable at | Junagadh |
Exempted Fee | Yes |
Minimum FDR | 908,122 INR. |
Maximum FDR | 908,122 INR. |
Other Details
Officer Inviting Bids | EXECUTIVE ENGINEER |
Bid Opening Authority | EXECUTIVE ENGINEER |
Address | Gujarat State Police Housing Corporation Ltd, P.T.C. Campus, Bilkha Road, Junagadh |
Contact Details | 0285-2622628 |
Tender Stages
Stage Name | Evaluation Date | Minimum Forms for Submission |
---|
1. prilimnary stage
Form Id | Form Name | Form Mode | Submission Type | Mandatory |
---|
Documents required for Stage - prilimnary stage
Sr No | Document Name | Mandatory |
---|---|---|
1 | (i) Copy of last I.T return filed (Last Financial year), partnership deed or memorandum as well as Articles of Association, in caseof the company or copy of registration under co-operative society All copies submitted shall be duly attested. | Yes |
2 | (ii) A certificate of Registration as approved contractor of prescribed category along with validity period from authorities stipulated in notice inviting tenders. | Yes |
3 | (iii) Copy of Provident fund Registration along with code number. | Yes |
4 | (iv) A solvency certificate of an amount equal to 25 Percent of the amount of work put to tender (having minimum validity on the date ofonline submission of tender) will have to be produced. Such solvency certificate should be issued by the banks as per clause2 (a) of section 3. | Yes |
5 | (v) Tender fees - Pay order / Demand Draft Cash Receipt of the Corporation. (Non Refundable ) | Yes |
6 | (vi) Earnest Money Deposit in the form of cash receipt of G.S.P.H.C. LTD. or Fixed Deposit Receipt of Banks (See clause no.2 of section-3 for details) OR EMD exemption certificate issued by G.S.P.H.C. LTD. Only. | Yes |
7 | (vii) Mandatory documents as per prequalification criteria/special tender conditions if applicable copies of certificate regarding previousexperience as required . as per tender condition. | Yes |
8 | (viii) Goods & Service Tax Registration Copy (GST) | Yes |
9 | (ix) Income tax pancard copy. | Yes |
10 | Affidavit (To be submitted IN ORIGINAL on Non-Judicial Stamp Paper of Rs.100/- duly attested by First Class Magistrate/Notary public).As per tender condition. | No |
Documents required For Form - Tender Fee Form
Sr No | Document Name | Mandatory |
---|---|---|
1 | Provide any proof of Bid Processing Fee | No |
Documents required For Form - Emd Fee Form
Sr No | Document Name | Mandatory |
---|---|---|
1 | Provide any proof of EMD Document | No |
2. technical bid
Form Id | Form Name | Form Mode | Submission Type | Mandatory |
---|
Documents required for Stage - technical bid
Sr No | Document Name | Mandatory |
---|---|---|
1 | Schedule-A | Yes |
2 | Schedule-B | Yes |
3 | Schedule-C | Yes |
4 | Schedule-D | Yes |
5 | Schedule-E | Yes |
6 | Schedule-F | Yes |
7 | Schedule-G | Yes |
8 | Schedule-H | Yes |
9 | Schedule-I | Yes |
3. Price bid
Form Id | Form Name | Form Mode | Submission Type | Mandatory |
---|
Certificate Details
Cert Serial No. | 62480845 |
Subject Dn | CN=MENDAPARA VIPULKUMAR MANSUKHLAL, SERIALNUMBER=84e502cbb5eb10bcd657448240555aedcd7d8a27041491ac5ca087cd657ff2d5, ST=Gujarat, OID.2.5.4.17=362001, OU="GSPHCL,CID - 6885018", OID.2.5.4.20=7181d17d5b5a2734e08eb0cbcd897b71fce4b7ab785bef624bf020455a61ff6d, O=GUJARAT STATE POLICE HOUSING CORPORATION LTD, C=IN |
Cert Issuer | CN=(n)Code Solutions Sub-CA for DSC 2022, OU=Sub-CA, O=Gujarat Narmada Valley Fertilizers and Chemicals Limited, C=IN |
Thumbprint | 63 69 23 1b e9 1b 7f 18 a6 5f a4 83 07 da a4 cf 47 c7 8e f7 |
General Terms & Conditions
General Terms and Conditions
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Technical bid as well as Price bid in Electronic format only on nprocure website till the Last Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to 5.00 P.M. at (n)code solutions-A Division of GNFC Ltd., Bidders are requested to take benefit of the same.
Bidders who wish to participate in online tenders will have to procure / should have legally valid Digital Certificate as per Information Technology Act-2000 (Class-III) using which they can sign their electronic bids. Bidders can procure the same from any of the license certifying Authority of India or can contract (n)code solutions- A division of GNFC Ltd, who are licensed Certifying Authority by Govt. of India.
In case bidders need any clarifications or if training required to participate in online tenders, they can contact (n)Procure Support team:-
(n)code Solutions-IT division of GNFC Ltd.,
(n)Procure Cell
304, GNFC Infotower, S.G. Road,
Bodakdev, Ahmedabad – 380054 (Gujarat)
+Contact Details
Phone
+91-79-40007517, 40007514, 40007515.
E-mail : nprocure@ncode.in
TOLL FREE NUMBER: 73590 21663
Other Terms & Conditions as per detailed tender documents
Tender Documents
Sr No | Document Name | Document Definition |
---|---|---|
1 | 1 SCHEDULE A RSI.pdf | 1 SCHEDULE A RSI.pdf |
2 | 2 SCH-B RSI 21-07-24 OKK.pdf | 2 SCH-B RSI 21-07-24 OKK.pdf |
3 | 3 PERCENTAGE_ABOVE_BELOW.pdf | 3 PERCENTAGE_ABOVE_BELOW.pdf |
4 | 1 Tilte Index.pdf | 1 Tilte Index.pdf |
5 | 2 All Conditions.pdf | 2 All Conditions.pdf |
6 | 33 PARA RSI.pdf | 33 PARA RSI.pdf |
7 | 34 Atteched Specification RSI.pdf | 34 Atteched Specification RSI.pdf |
8 | 35 CC RSI.pdf | 35 CC RSI.pdf |
9 | 36 Elec Condition .pdf | 36 Elec Condition .pdf |
10 | B-1 Percentage Rate TENDER DOCUMENT.pdf | B-1 Percentage Rate TENDER DOCUMENT.pdf |
11 | Electrical Booklet 2024.pdf | Electrical Booklet 2024.pdf |
12 | Genral Techinal Specification.pdf | Genral Techinal Specification.pdf |
13 | New Jaher Nivida 2024-25 (13).pdf | New Jaher Nivida 2024-25 (13).pdf |
14 | GSPHC_ARC_INAJ_LAyout.pdf | GSPHC_ARC_INAJ_LAyout.pdf |
15 | 03_110815_RAMP DAMDAMO.pdf | 03_110815_RAMP DAMDAMO.pdf |
16 | 05_110815_AWEDO.pdf | 05_110815_AWEDO.pdf |
17 | grass godown.pdf | grass godown.pdf |
18 | HORSE STABLE 20 10 Inaj PHQ Horse section.pdf | HORSE STABLE 20 10 Inaj PHQ Horse section.pdf |
19 | HORSE STABLE 20 10 Inaj PHQ Horse Table.pdf | HORSE STABLE 20 10 Inaj PHQ Horse Table.pdf |
20 | MOUNTED OFFICE WORKING PLAN1.pdf | MOUNTED OFFICE WORKING PLAN1.pdf |
21 | MOUNTED OFFICE WORKING PLAN2.pdf | MOUNTED OFFICE WORKING PLAN2.pdf |
22 | MOUNTED OFFICE WORKING PLAN3.pdf | MOUNTED OFFICE WORKING PLAN3.pdf |
23 | MOUNTED OFFICE WORKING PLAN4.pdf | MOUNTED OFFICE WORKING PLAN4.pdf |
24 | MOUNTED OFFICE WORKING PLAN5.pdf | MOUNTED OFFICE WORKING PLAN5.pdf |
25 | MOUNTED OFFICE WORKING PLAN6.pdf | MOUNTED OFFICE WORKING PLAN6.pdf |
26 | MOUNTED OFFICE WORKING PLAN7.pdf | MOUNTED OFFICE WORKING PLAN7.pdf |
27 | MOUNTED OFFICE WORKING PLAN8.pdf | MOUNTED OFFICE WORKING PLAN8.pdf |
28 | INAJ R.S.I.OFFICE WORKING-_Backside Elevation.pdf | INAJ R.S.I.OFFICE WORKING-_Backside Elevation.pdf |
29 | INAJ R.S.I.OFFICE WORKING-_FF.pdf | INAJ R.S.I.OFFICE WORKING-_FF.pdf |
30 | INAJ R.S.I.OFFICE WORKING-_Front Elevation.pdf | INAJ R.S.I.OFFICE WORKING-_Front Elevation.pdf |
31 | INAJ R.S.I.OFFICE WORKING-_Section.pdf | INAJ R.S.I.OFFICE WORKING-_Section.pdf |
32 | INAJ R.S.I.OFFICE WORKING-_SF.pdf | INAJ R.S.I.OFFICE WORKING-_SF.pdf |
33 | INAJ R.S.I.OFFICE WORKING-_Terrace.pdf | INAJ R.S.I.OFFICE WORKING-_Terrace.pdf |
34 | INAJ R.S.I.OFFICE WORKING-Gf.pdf | INAJ R.S.I.OFFICE WORKING-Gf.pdf |
35 | INAJ R.S.I.OFFICE WORKING-Lift Machine Room.pdf | INAJ R.S.I.OFFICE WORKING-Lift Machine Room.pdf |
36 | R2 AWRDO INAJ PHQ G.F 05-12-2020.pdf | R2 AWRDO INAJ PHQ G.F 05-12-2020.pdf |
37 | 1.0 FOUNDATION COLUMN LAYOUT.pdf | 1.0 FOUNDATION COLUMN LAYOUT.pdf |
38 | 3.0 TIE BEAM LAYOUT.pdf | 3.0 TIE BEAM LAYOUT.pdf |
39 | 4.0 TIE BEAM DETAIL.pdf | 4.0 TIE BEAM DETAIL.pdf |
40 | 5.0 LINTEL LAYOUT DETAILS.pdf | 5.0 LINTEL LAYOUT DETAILS.pdf |
41 | 7.0 ROOF BEAM BOTTOM DETAILS.pdf | 7.0 ROOF BEAM BOTTOM DETAILS.pdf |
42 | 8.0 ROOF SECTION DETAILS.pdf | 8.0 ROOF SECTION DETAILS.pdf |
43 | 1.0 FOUNDATION LAYOUT.pdf | 1.0 FOUNDATION LAYOUT.pdf |
44 | 2.0 COLUMN SCHEDULE.pdf | 2.0 COLUMN SCHEDULE.pdf |
45 | 3.0 TIE BEAM LAYOUT 1.pdf | 3.0 TIE BEAM LAYOUT 1.pdf |
46 | 4.0 TIE BEAM DETAIL 1.pdf | 4.0 TIE BEAM DETAIL 1.pdf |
47 | 5.0 TERRACE SLAB LAYOUT.pdf | 5.0 TERRACE SLAB LAYOUT.pdf |
48 | 6.0 TERRACE LEVEL BEAM DETAIL.pdf | 6.0 TERRACE LEVEL BEAM DETAIL.pdf |
49 | 7.0 LINTEL DETAIL.pdf | 7.0 LINTEL DETAIL.pdf |
50 | 8.0 ROOF LEVEL DETAIL.pdf | 8.0 ROOF LEVEL DETAIL.pdf |
51 | 1.0 FOUNDATION LAYOUT 1.pdf | 1.0 FOUNDATION LAYOUT 1.pdf |
52 | 2.0 COLUMN SCHEDULE1.pdf | 2.0 COLUMN SCHEDULE1.pdf |
53 | 3.0 TIE BEAM LAYOUT1.pdf | 3.0 TIE BEAM LAYOUT1.pdf |
54 | 4.0 TIE BEAM DETAIL-1.pdf | 4.0 TIE BEAM DETAIL-1.pdf |
55 | 5.0 TIE BEAM DETAIL-2.pdf | 5.0 TIE BEAM DETAIL-2.pdf |
56 | 6.0 TERRACE LAYOUT.pdf | 6.0 TERRACE LAYOUT.pdf |
57 | 7.0 TERRACE LAVEL BEAM DETAIL-1.pdf | 7.0 TERRACE LAVEL BEAM DETAIL-1.pdf |
58 | 8.0 TERRACE LAVEL BEAM DETAIL-2.pdf | 8.0 TERRACE LAVEL BEAM DETAIL-2.pdf |
59 | 9.0 TERRACE LEVEL BEAM DETAIL-3.pdf | 9.0 TERRACE LEVEL BEAM DETAIL-3.pdf |
60 | 10.0 LINTEL DETAIL.pdf | 10.0 LINTEL DETAIL.pdf |
61 | 11.0 STAIRCASE DETAIL.pdf | 11.0 STAIRCASE DETAIL.pdf |
62 | 12.0 STAIRCABIN DETAIL.pdf | 12.0 STAIRCABIN DETAIL.pdf |
63 | 13.0 STEEL ROOF DETAIL.pdf | 13.0 STEEL ROOF DETAIL.pdf |
64 | RAMP INAJ-PHQ 01-12-2020.pdf | RAMP INAJ-PHQ 01-12-2020.pdf |
65 | ST-02_FOUNDATION LAYOUT DETAILS_26-08-20.pdf | ST-02_FOUNDATION LAYOUT DETAILS_26-08-20.pdf |
66 | ST-02A_FOUNDATION DETAILS_26-08-20.pdf | ST-02A_FOUNDATION DETAILS_26-08-20.pdf |
67 | ST-02B_FOUNDATION DETAILS_26-08-20.pdf | ST-02B_FOUNDATION DETAILS_26-08-20.pdf |
68 | ST-02C_FOUNDATION DETAILS_26-08-20.pdf | ST-02C_FOUNDATION DETAILS_26-08-20.pdf |
69 | ST-02D_LIFT WALL DETAILS_26-08-20.pdf | ST-02D_LIFT WALL DETAILS_26-08-20.pdf |
70 | ST-03_COLUMN SHEDULE_26-08-20.pdf | ST-03_COLUMN SHEDULE_26-08-20.pdf |
71 | ST-03A_COLUMN SHEDULE_26-08-20.pdf | ST-03A_COLUMN SHEDULE_26-08-20.pdf |
72 | ST-04_GROUND LVL.BEAM LAYOUT DETAILS_26-08-20.pdf | ST-04_GROUND LVL.BEAM LAYOUT DETAILS_26-08-20.pdf |
73 | ST-04A_GROUND LVL. DETAILS_26-08-20.pdf | ST-04A_GROUND LVL. DETAILS_26-08-20.pdf |
74 | ST-04B_GROUND LVL. BEAM L.S DETAILS_26-08-20.pdf | ST-04B_GROUND LVL. BEAM L.S DETAILS_26-08-20.pdf |
75 | ST-04C_GROUND LVL. BEAM L.S DETAILS_26-08-20.pdf | ST-04C_GROUND LVL. BEAM L.S DETAILS_26-08-20.pdf |
76 | ST-05_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf | ST-05_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf |
77 | ST-05A_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf | ST-05A_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf |
78 | ST-05B_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf | ST-05B_STAIRCASE LAYOUTS DETAILS_26-08-20.pdf |
79 | ST-06_GROUND FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf | ST-06_GROUND FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf |
80 | ST-07_GROUND FLOOR SLAB LVL.BEAM LAYOUT DETAILS_26-08-20.pdf | ST-07_GROUND FLOOR SLAB LVL.BEAM LAYOUT DETAILS_26-08-20.pdf |
81 | ST-07A_GROUND FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf | ST-07A_GROUND FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf |
82 | ST-07B_GROUND FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf | ST-07B_GROUND FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf |
83 | ST-07C_GROUND FLOOR SLAB LAYOUT DETAILS_26-08-20.pdf | ST-07C_GROUND FLOOR SLAB LAYOUT DETAILS_26-08-20.pdf |
84 | ST-08_FIRST FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf | ST-08_FIRST FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf |
85 | ST-09_FIRST FLOOR SLAB LVL.BEAM LAYOUT DETAILS_26-08-20.pdf | ST-09_FIRST FLOOR SLAB LVL.BEAM LAYOUT DETAILS_26-08-20.pdf |
86 | ST-09A_FIRST FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf | ST-09A_FIRST FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf |
87 | ST-09B_FIRST FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf | ST-09B_FIRST FLOOR SLAB LVL.BEAM LS DETAILS_26-08-20.pdf |
88 | ST-09C_FIRST FLOOR SLAB LAYOUT DETAILS_26-08-20.pdf | ST-09C_FIRST FLOOR SLAB LAYOUT DETAILS_26-08-20.pdf |
89 | ST-11_TERRACE LVL.BEAM LAYOUT DETAILS_26-08-20.pdf | ST-11_TERRACE LVL.BEAM LAYOUT DETAILS_26-08-20.pdf |
90 | ST-10_SECOND FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf | ST-10_SECOND FLOOR LINTEL LVL.LAYOUT DETAILS_26-08-20.pdf |
91 | ST-11A_TERRACE LVL.BEAM L.S.DETAILS_26-08-20.pdf | ST-11A_TERRACE LVL.BEAM L.S.DETAILS_26-08-20.pdf |
92 | ST-11B_TERRACE LVL.BEAM L.S.DETAILS_26-08-20.pdf | ST-11B_TERRACE LVL.BEAM L.S.DETAILS_26-08-20.pdf |
93 | ST-11C_TERRACE LVL.SLAB LAYOUT DETAILS_26-08-20.pdf | ST-11C_TERRACE LVL.SLAB LAYOUT DETAILS_26-08-20.pdf |
94 | ST-12_STAIR CABIN LINTEL DETSILS_26-08-20.pdf | ST-12_STAIR CABIN LINTEL DETSILS_26-08-20.pdf |
95 | ST-99_COLUMN CENTERLINE LAYOUT_26-08-20.pdf | ST-99_COLUMN CENTERLINE LAYOUT_26-08-20.pdf |