|
Subject |
|
Corrigendum for the work Construction of 13 buildings at various locations in India for Unified Network Management System including finishing work, water supply and Sanitary Installation, Electric installation and cable laying Automatic fire detecting and Fire fighting lifts ,AC Ducting for HVAC, Split/cassette type ACs and development works etc( SH Covering of HVAC & Electric ,Fuel trench with chequred plate etc at NNc delhi cantt and NLDC Anand parbat ) |
|
|
Number |
|
EE(c )/CD-I/BSNL/ND/2024-25/10. Dated: 18.05.2024 |
|
|
Corrigendum for the work Construction of 13 buildings at various locations in India for Unified Network Management System including finishing work, water supply and Sanitary Installation, Electric installation and cable laying Automatic fire detecting and Fire fighting lifts ,AC Ducting for HVAC, Split/cassette type ACs and development works etc( SH Covering of HVAC & Electric ,Fuel trench with chequred plate etc at NNc delhi cantt and NLDC Anand parbat ) |
|