Welcome to eProcurement - Tender Management System - Govt of .... Welcome To Tender Management Services
View Tender Details

Open main source page if you have any problem in document.

Current Tender Details  
Tender ID 729951 Enquiry/IFB/Tender Notice Number NIT No:38/TS/EE-G/APSPHC/VSP/2023-24, Dated:05.03.2024
Name of Work CONSTRUCTION OF FORTIFIED POLICE STATION BUILDING AT KURUPAM OF VIZIANAGARAM DISTRICT SUB WORK: SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF DRONE CAMERA FOR FPSB AT KURUPAM OF VIZIANAGARAM DISTRICT Tender Category WORKS
Tender Type OPEN - NCB Estimated Contract Value ₹ 1,79,835
Bid Submission Closing Date 12/03/2024 11:50 AM Tender Evaluation Type Percentage

Enquiry Particulars  
Department Name AP STATE POLICE HOUSING CORPORATION LIMITED
Circle/Division AP STATE POLICE HOUSING CORPORATION LIMITED-Executive Engineer Garividi Division
Tender ID 729951
IFB No / Tender Notice Number NIT No:38/TS/EE-G/APSPHC/VSP/2023-24, Dated:05.03.2024
Name of Project LWE police Stations
Name of Work CONSTRUCTION OF FORTIFIED POLICE STATION BUILDING AT KURUPAM OF VIZIANAGARAM DISTRICT SUB WORK: SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF DRONE CAMERA FOR FPSB AT KURUPAM OF VIZIANAGARAM DISTRICT
Estimated Contract Value(INR)
₹ 1,79,835  
   
()
Package number N/A
Period of Completion/ Delivery Period (in months) 01
Type of Work Electrical Works
Bidding Type OPEN
Bid Call (Numbers) Short Tender Notice - 1st Call
Tender Category WORKS
Currency Type (INR)
Default Currency Indian Rupee - INR
Evaluation Type Percentage
Evaluation Criteria Based on Price
Form Of Contract L.S
Not Applicable
Reverse Tendering Not Applicable

Transaction Fee Details  
64 (INR)

Tender Dates
Bid Document Download Start Date & Time 05/03/2024 11:45 AM
Bid Document Download End Date & Time 12/03/2024 11:45 AM
Bid Submission Closing Date & Time 12/03/2024 11:50 AM
Bid Validity Period (in Days) 90

Tender Inviting Authority Particulars  
Officer Inviting Bids Executive Engineer, PHC, Garividi Division
Bid Opening Authority Executive Engineer, PHC Garividi Division
Address A.P.STATE POLICE HOUSING CORP, GROUND FLOOR, NEAR SP OFFICE(DPO),OLD CBI, PEDAWALTIER, VISAKHAPATNAM
Contact Details 9440700735
Email eegarividiapsphc@gmail.com

Bid Security Details  
Bid Security (INR) Rs.1799.00
Bid Security In Favour Of V.C and Managing Director APSPHCLtd.,Mangalagiri,
Mode of Payment Online Payment,Challan Generation

Process Fee Details
Process Fee Process Fee Payable To
3540.00(INR) V.C and Managing Director,APSPHCLtd ,Mangalagiri,

Required Tender Documents Details  
S.No Document Name Stage Document Type
1 Contractor or Firm Should be Submitted Similar /equivalent Nature of work experience in E Procurement COMMON Mandatory
2 2. EMD Certificate. 3. Transaction Fee Certificate Payable to C1 India. 4. Processing Fee. 5. PAN Card. 6. AP GST Registration.6. Similer nature of work experience COMMON Mandatory

General Terms and Conditions / Eligibility  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel:

General Technical Terms and Conditions (Procedure)  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel:

Legal Terms & Conditions  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel:

Procedure for Bid Submission  
Procedure for Bid Submission

Geographical Particulars  
Sno State District Mandal Assembly Parliament
1 ANDHRA PRADESH PARVATHIPURAM MANYAM KURUPAM KURUPAM ARAKU

Enquiry Forms
Stage Details Close
   
S.No Stage Name Evaluation Opening date & Time Evaluation Dependencies
1 Commercial Stage 12/03/2024 11:55 AM
Stage Form Name Type of Form Supporting Document Required Supporting Document Description View Details
Commercial Stage Percentage Wise Rate Secure No N/A


View BOQ Item Details | View Tender Documents