Welcome to eProcurement - Tender Management System - Govt of .... Welcome To Tender Management Services
View Tender Details

Open main source page if you have any problem in document.

Current Tender Details  
Tender ID 743005 Enquiry/IFB/Tender Notice Number NIT No:01/TS/EE-G/APSPHC/VSP/2024-25, Dated:12.07.2024
Name of Work Construction of Fortified Police Station Building at Chinnamerangi of Vizianagaram District Sub Work: Construction of Compoundwall( Balance work) Tender Category WORKS
Tender Type OPEN - NCB Estimated Contract Value ₹ 2,24,992
Bid Submission Closing Date 19/07/2024 04:15 PM Tender Evaluation Type Percentage

Enquiry Particulars  
Department Name AP STATE POLICE HOUSING CORPORATION LIMITED
Circle/Division AP STATE POLICE HOUSING CORPORATION LIMITED-Executive Engineer Visakhapatnam City
Tender ID 743005
IFB No / Tender Notice Number NIT No:01/TS/EE-G/APSPHC/VSP/2024-25, Dated:12.07.2024
Name of Project SIS -HOME
Name of Work Construction of Fortified Police Station Building at Chinnamerangi of Vizianagaram District Sub Work: Construction of Compoundwall( Balance work)
Estimated Contract Value(INR)
₹ 2,24,992  
   
()
Package number N/A
Period of Completion/ Delivery Period (in months) 01
Type of Work Civil Works
Bidding Type OPEN
Bid Call (Numbers) Short Tender Notice - 1st Call
Tender Category WORKS
Currency Type (INR)
Default Currency Indian Rupee - INR
Evaluation Type Percentage
Evaluation Criteria Based on Price
Form Of Contract L.S
Not Applicable
Reverse Tendering Not Applicable

Transaction Fee Details  
80 (INR)

Tender Dates
Bid Document Download Start Date & Time 12/07/2024 04:00 PM
Bid Document Download End Date & Time 19/07/2024 04:00 PM
Bid Submission Closing Date & Time 19/07/2024 04:15 PM
Bid Validity Period (in Days) 90

Tender Inviting Authority Particulars  
Officer Inviting Bids EXECUTIVE ENGINEER
Bid Opening Authority EXECUTIVE ENGINEER
Address APSPHC Ltd,peada walthair, beside ol dpo
Contact Details 9440700797
Email eephcvsp2@gmail.com

Bid Security Details  
Bid Security (INR) Rs.2250.00
Bid Security In Favour Of MD, APSPHCL, Mangalagiri
Mode of Payment Online Payment,Challan Generation

Process Fee Details
Process Fee Process Fee Payable To
3540.00(INR) MD,APSPHCL, MANGALAGIRI

Required Tender Documents Details  
S.No Document Name Stage Document Type
1 1)REGISTRATION CERTIFICATE 2)EMD 3) Transaction fee 4) processing fee 5) PAN 6)GST COMMON Mandatory

General Terms and Conditions / Eligibility  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel: The successful tenderer shall have to employ the following technical staff on full time basis to be available at site. Cost of work (Technical sanction amount) Qualification of Technical Staff Upto Rs.10 Lakhs One I.T.I. candidate Above Rs.10.00 lakhs and up to Rs.50.00 lakhs One Diploma Engineer. 7.2 Employment of technical personnel shall be with reference to the estimate cost of work. 7.3 In case the contractor himself is a Diploma holder / Graduate Engineer no agent need to be appointed to supervise works costing up to Rs.5.00 lakhs. Even if the contractor is himself a technically qualified person, he shall employ technical staff on the scale prescribed for supervising works when more than one work is undertaken and if they are beyond a radius of 5 Kms. One or more works within a radius of say 5 Km. shall be treated as a single work for the purpose of employment of technical staff. 7.4 The appointment of technical staff shall be on full time basis. And they shall be available at work site for supervising the work including quality checking of all items from time to time. Failure to employ the required technical personnel by the contractor the following amounts will be recovered from the contractors bills

General Technical Terms and Conditions (Procedure)  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel: The successful tenderer shall have to employ the following technical staff on full time basis to be available at site. Cost of work (Technical sanction amount) Qualification of Technical Staff Upto Rs.10 Lakhs One I.T.I. candidate Above Rs.10.00 lakhs and up to Rs.50.00 lakhs One Diploma Engineer. 7.2 Employment of technical personnel shall be with reference to the estimate cost of work. 7.3 In case the contractor himself is a Diploma holder / Graduate Engineer no agent need to be appointed to supervise works costing up to Rs.5.00 lakhs. Even if the contractor is himself a technically qualified person, he shall employ technical staff on the scale prescribed for supervising works when more than one work is undertaken and if they are beyond a radius of 5 Kms. One or more works within a radius of say 5 Km. shall be treated as a single work for the purpose of employment of technical staff. 7.4 The appointment of technical staff shall be on full time basis. And they shall be available at work site for supervising the work including quality checking of all items from time to time. Failure to employ the required technical personnel by the contractor the following amounts will be recovered from the contractors bills

Legal Terms & Conditions  
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female, and vice-versa. Headings have no significance. Works have their normal meaning under the language of the contract unless specifically defined. The Engineers-in-charge will provide instructions clarifying queries about the conditions of Contract. 1.2 The documents forming the Contract shall be interpreted in the following order of priority: 1) Agreement 2) Letter of Acceptance, notice to proceed with the works 3) Contractor?s Tender (Technical bid) 4) Conditions of contract 5) Specifications 6) Drawings 7) Bill of quantities (Price-bid) 8) Any other document listed as forming part of the Contract. 2. Managing Director?s Decisions: 2.1 Except where otherwise specifically stated, the Managing Director or his nominee will decide the contractual matters between the Corporation and the Contractor in the role representing the Corporation. 3. Delegation: 3.1 The Managing director may delegate any of his duties and responsibilities to other officers and may cancel any delegation by an official order issued. 4. Communications: 4.1 Communications between parties, which are referred to in the conditions, are effective only when in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act) 5. (Sub-contracting) Subletting works by contractors: 5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along with details of his qualification and experience. The Tender Accepting Authority should verify the experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in proportion to the value of work proposed to be sub-let, he may permit the same. The total value of works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of subletting shall be added to the experience of the sub-contractor and to that extent deducted from that of the main contractor. 5.2 The subletting of works without prior written approval of the Tender Accepting Authority is strictly prohibited. In the event, it is found that any portion of the work is sublet without prior written approval of the Tender Accepting Authority, action will be taken against the contractor by debarring him from participating in the tenders for the period as decided by the Engineer-in-Chief / Chief Engineer. 6. Other Contractors: 6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities, and the Corporation. The Contractor shall also provide facilities and services for them as directed by the Engineer-in-charge. 7. Personnel: 7.1 The Contractor shall employ the required Key Personnel named in the Schedule of Key Personnel to carry out the functions stated in the Schedule or other personnel approved by the Engineer-in-charge. The Engineer-in-charge will approve any proposed replacement of Key Personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the Schedule. Schedule of Key Personnel: The successful tenderer shall have to employ the following technical staff on full time basis to be available at site. Cost of work (Technical sanction amount) Qualification of Technical Staff Upto Rs.10 Lakhs One I.T.I. candidate Above Rs.10.00 lakhs and up to Rs.50.00 lakhs One Diploma Engineer. 7.2 Employment of technical personnel shall be with reference to the estimate cost of work. 7.3 In case the contractor himself is a Diploma holder / Graduate Engineer no agent need to be appointed to supervise works costing up to Rs.5.00 lakhs. Even if the contractor is himself a technically qualified person, he shall employ technical staff on the scale prescribed for supervising works when more than one work is undertaken and if they are beyond a radius of 5 Kms. One or more works within a radius of say 5 Km. shall be treated as a single work for the purpose of employment of technical staff. 7.4 The appointment of technical staff shall be on full time basis. And they shall be available at work site for supervising the work including quality checking of all items from time to time. Failure to employ the required technical personnel by the contractor the following amounts will be recovered from the contractors bills

Procedure for Bid Submission  
Procedure for Bid Submission

Geographical Particulars  
Sno State District Mandal Assembly Parliament
1 ANDHRA PRADESH PARVATHIPURAM MANYAM KURUPAM kurupam parvathipuram

Enquiry Forms
Stage Details Close
   
S.No Stage Name Evaluation Opening date & Time Evaluation Dependencies
1 Commercial Stage 19/07/2024 04:30 PM
Stage Form Name Type of Form Supporting Document Required Supporting Document Description View Details
Commercial Stage Percentage Wise Rate Secure No N/A


View BOQ Item Details | View Tender Documents