Procedure for Bid
Submission
D. SUBMISSION OF BIDS.
16. Submission of Bids:
16.1 The following self attested certificates, documents etc, are to be scanned and uploaded on to the ?e ?procurement platform at www.apeprocurement.gov.in.
a) Copy of contractors registration certificate under appropriate class with Government of Andhra Pradesh
b) EMD as specified in the form (EMD shall be paid online only)
c) PAN Card and Latest I.T. Returns
d) GST Registration certificate incorporating Tax Identification Number (TIN)
e) Qualification certificate of Key personnel
16.2 The bidders who are desirous of participating in ?e? procurement shall submit their Technical bids, price bids etc., in the Standard formats prescribed in the Tender documents, displayed at ?e? market place. The bidders should upload the scanned copies in support of their Technical bids. The bidders shall sign on all the statements, documents, certificates, uploaded by him, owning responsibility for their correctness/authenticity.
16.3 The Department will not hold any risk and responsibility for the loss in transit during uploading of the scanned document, for the invisibility of the scanned document online, and any other problems encountered by the Tenders while submitting their bids online.
17 Deleted
18 Last date / time for Submission of the Bids.
18.1 Bids must be submitted not later than the date and time specified in NIT. In the event of the specified date / time for the submission of bids declared as holiday, the bids will be received on the next working day up to the time specified..
18.2 The Executive Engineer may extend the dates for issue and receipt of Bids by issuing an amendment in which case all rights and obligations of the Executive Engineer and the Bidders will remain same as previously.
19 Late Bids.
19.1 Any Bid received after the last date / time prescribed in NIT will be summarily rejected.
20 Modification to the Bid.
20.1 No Bid shall be modified after the last date /time of submission of Bids.
E. BID OPENING AND EVALUATION
21 Bid opening
21.1 The Technical bids will be opened online by the concerned Executive Engineer at the time and date as specified in the tender documents. All the Statements, documents, certificates, EMD shall be paid online only etc, uploaded by the Tenders will be verified and downloaded, for technical evaluation. The clarifications, particulars if any required from the bidders, will be obtained either online or in the conventional method by addressing the bidders. The technical bids will be evaluated against the specified parameters/criteria same as in the case of conventional tenders and the technically qualified bidders will be identified. The result of Technical bids evaluation will be displayed on the ?e? market place, which can be seen by all the tenderers who participated in the tenders.
The department shall carry out the technical bid evaluation solely based on the uploaded certificates/documents, EMD shall be paid online only in the e-procurement system and open the price bids of the responsive bidders.
22 Clarification on the Technical Bid.
22.1 The tender opening authority may call upon any tenderer for clarification on the statements, documentary proof relating to the technical bid. The request for clarification and response thereto shall be in writing and it shall be only on the qualification information uploaded online by the tenderer. The clarification called for from the tenderers shall be furnished within the stipulated time, which shall not be more than a week.
22.2 The tenderer if so desirous, shall agree in writing to furnish the clarification called for within the stipulated time and, for disqualification and rejection of his tender in the event of failure to do so.
23 Examination of technical Bids and Determination of Responsiveness --Deleted-
24 Price Bid Opening:
b) Price Bid Opening:
24.1 Only the Price Bids of qualified Bidders whose Bids are found satisfying the eligibility criteria shall be opened.
24.2 Bids shall be scrutinised in accordance with the conditions stipulated in the Bid document. In case of any discrepancy of non-adherence Conditions the Bid accepting authority shall communicate the same which will be binding both on the bid Opening authority and the Bidder. In case of any ambiguity, the decision taken by the Bid Accepting Authority on bids shall be final.
25. Evaluation and Comparison of Price Bids
25.1 The Executive Engineer, Tribal Welfare, Paderu, will evaluate and compare the price bids of all the qualified Bidders.
25.2 Negotiations at any level are strictly prohibited. However, good gesture rebate, if offered by the lowest bidder prior to finalisation of bids may be accepted by the bid accepting authority.
25.3 Selection of Bidder among the lowest & equally quoted bidders will be in the following
orders:
a) The bidder whose bid capacity is higher will be selected.
b) In case the bid capacity is also same the bidder whose annual turnover is more will be preferred.
c) Even if the criteria incidentally become the same, the turnover on similar works and thereafter machinery available for the work and then the clean track record will be considered for selection.
26. Discrepancy in Tender percentage quoted
26.1 In case of any discrepancy between the overall bid percentage quoted in words and figures, the percentage quoted in words shall prevail. In case the bidder has quoted overall bid percentage only in words and not in figures or vice versa, such bid shall be treated as incomplete and rejected.
27. Process to be Confidential.
27.1 Information relating to the examination, clarification, evaluation and comparison of Bids and recommendations for the award of a contract shall not be disclosed to Bidders or any other persons not officially concerned with such process until the award to the successful Bidder has been announced by the bid accepting authority. Any effort by a Bidder to influence the processing of Bids or award decisions may result in the rejection of his Bid.
27.2 No Bidder shall contact the Executive Engineer, Tribal Welfare, Paderu, or any authority concerned with finalisation of bids on any matter relating to its Bid from the time of the Bid opening to the time the Contract is awarded. If the Bidder wishes to bring additional information to the notice of the Executive Engineer, Tribal Welfare, Paderu, it should do so in writing.
27.3 Before recommending / accepting the bid, the bid recommending / accepting authority shall verify the correctness of certificates submitted to meet the eligibility criteria and specifically experience.
27.4 Bids will be finalised by the Executive Engineers / Superintending Engineers / Chief Engineers for the works costing up to Rs.2.00 Crores. The bids for the works costing more than Rs.2.00 Crores will be referred to COT along with technical bid evaluation for consideration. The Commissioner of bids shall scrutinize the bids submitted by Engineer-in-Chief / Chief Engineer / Project administrators in accordance with the conditions stipulated in the bid document and in case any discrepancy of non-adherence to the conditions, the same shall be communicated which will be binding both on the bid concluding authority and contractor. In case of any ambiguity the decision taken by the COT on bids shall be final.
F. AWARD OF CONTRACT
28 Award Criteria
28.1 The Executive Engineer, Tribal Welfare, Paderu, will award or recommend to the Competent bid accepting authority for award of the contract to the Bidder who is found Technically qualified as per the Bid conditions and whose price bid is lowest.
28.2 The bid accepting authority reserves the right to accept or reject any Bid or all bids and to cancel the Biding process, at any time prior to the award of Contract, without thereby incurring any liability to the affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the reasons for such action.
29 Notifications of Award and Signing of Agreement.
29.1 The Bidder whose Bid has been accepted will be notified of the award of the work by the Executive Engineer, Tribal Welfare, Paderu, prior to expiration of the Bid validity period by registered letter. This letter (hereinafter and in the Conditions of Contract called ?Letter of Acceptance?) will indicate the sum that the Government will pay the Contractor in consideration of the execution, completion, and maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the Contract called the ?Contract Amount?).
29.2 When a bid is accepted the concerned bidder shall attend the office of the Executive Engineer, Tribal Welfare, Paderuon the date fixed in the Letter of acceptance. Upon intimation being given by the Executive Engineer, Tribal Welfare, Paderu of acceptance of his bid, the bidder shall make payment of the balance E.M.D., and additional security deposit wherever needed by way of Demand Draft obtained from a Schedule Bank, and sign an agreement in the form prescribed by the department for the due fulfilment of the contract. Failure to attend the Executive Engineer, Tribal Welfare, Paderu office on the date fixed, in the written intimation, to enter into the required agreement shall entail forfeiture of the Earnest Money deposited. The written agreement to be entered into between the contractor and the Government shall be the foundation of the rights and obligations of both the parties and the contract shall not be deemed to be completed until the agreement has first been signed by the contractor and then by the proper officer authorised to enter into contract on behalf of the Government.
29.3 The successful bidder has to sign an agreement within a period of 15 days from the date of receipt of communication of acceptance of his bid. On failure to do so his bid will be cancelled duly forfeiting the E.M.D., paid by him without issuing any further notice and action will be initiated for black listing the bidder.
29.4 If the successful bidder backs out from entering into agreement at the last minute causing loss to Govt. will be debarred for one year from participating in the tendering process of any department of the Govt. besides forfeiture of the 1% EMD.
29.5 If the successful bidder of a single bid received backs out from entering into agreements the EMD will be forfeited but the bidder will be debarred for six months from participating in the tendering process of any department of the Govt
30.Corrupt or Fraudulent Practices
30.1 The Government require that the bidders / suppliers / contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts. In pursuance of this policy, the Government
(a) define for the purposes of the provision, the terms set forth below as follows:
(i) ?corrupt practices? means the offering, giving, receiving or soliciting of any thing of value to influence the action of a Government official in procurement process or in contract execution: and
(ii) ?fraudulent practice? means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment of the Government and includes collusive practice among Bidders (prior to or after Bid submission) designed to establish in Bid prices at artificial non-competitive levels and to deprive the Government of the benefits of free and open competition.
(b) Will reject a proposal for award if it determines that the Bidder recommended for award has engaged in corrupt or fraudulent practices in competing for the contract in question.
(c) Will blacklist / or debar a firm, either indefinitely or for a stated period of time, if at any time determines that the firm has engaged in corrupt or fraudulent practices in competing for, or in executing a Government Contract.
(d) Further more, Bidders shall be aware of the provisions stated in the General Conditions of Contract.
FORMS OF BID
QUALIFICATION INFORMATION
Annexure ?I
CHECKLIST TO ACOMPANY THE BID
S.No Description Submitted in Cover ?A? Page No. (see Note below)
1 2 3 4
1 Copy of Contractors valid Registration under appropriate Class with Government of Andhra Pradesh.
Yes / No
2 Copy of PAN Card and SARAL for proof of having files IT Returns Latest
Yes / No
3 Copies of AP GST (TIN No.) Registration .
Yes / No
4 List of certificates enclosed Yes / No
DECLARATION
I / WE ????????????????????????. have gone through carefully all the Bid conditions and solemnly declare that I / we will abide by any penal action such as disqualification or black listing or determination of contract or any other action deemed fit, taken by, the Department against me / us, if it is found that the statements, documents, certificates produced by me / us are false / fabricated.
I / WE hereby declare that, I / WE have not been blacklisted / debarred / Suspended / demoted in any department in Andhra Pradesh or in any State due to any reasons.
Signature of the Bidder
CONDITIONS OF CONTRACT
BID
Date: ?????
To
The Executive Engineer, Tribal Welfare,
Paderu.
Sir,
I / We do hereby bid and if this bid be accepted, I/WE under take to execute the following work
viz?- Construction of MPP School at Palamamidi (V) in Koyyuru (M) of ASR District - Esti.Rs.24.00 lakhs
as shown in the drawings and described in the specifications deposited in the office of the Executive Engineer, Tribal Welfare, Paderu with such variations by way of alterations or additions to, and omissions from the said works and method of payment as provided for in the ?conditions of the contract? for the sum of Rupees ?????............???????????????????????...................................................................????. ?????????????????????or such other sum as may be arrived under the clause of the standard preliminary specifications relating to ?Payment on lump-sum basis or by final measurement at unit rates?
I/WE have also quoted percentage excess or less on E.C.V., in Schedule ?A? Part-I, annexed (in words and figures) for which I/We agree to execute the work when the lump sum payment under the terms of the agreement is varied by payment on measurement quantities.
I/WE have quoted Percentage excess or less on E.C.V., in Schedule ?A? Part ? I both in words & figures. In case of any discrepancy between the Percentage excess or less on E.C.V., in words and figures, the rates quoted in words only shall prevail.
I/WE agreed to keep the offer in this bid valid a period of Three month(s) mentioned in the bid notice and not to modify the whole or any part of it for any reason within above period. If the bid is withdrawn by me/us for any reasons whatsoever, the earnest money paid by me/us will be forfeited to Government.
I/WE hereby District. (2nd call) inctly and expressly, declare and acknowledge that, before the
|