Work Description | PL No. 33510260:Supply of stainless steel tubes with Stainless Steel double ferrule fittings for VP/Parcel V
an/LHB design high capacity Parcel van with collapsable doors and luggage racks with FIAT Bogies, m
aterial schedule no. ICF/SK-10-2-681, issue status-01, rev-00 and as per specification no.ICF/MD/Spec-
166 (with latest revisions / amendments). Packing Instruction :SPI042 (DFF)
PL No.33512000:Supply of Stainless steel tubes with stainless steel double ferrule fittings for LWSCZ & L
WSCZAC COACHES. as per Drg. No. as per ICF specification no.-ICF/MD/SPEC-166 (with latest revision/
amendments) and material schedule ICF/SK-10-2-638, ISSUE STATUS-01, REV.00, CS-01 & 02. Packing
instruction: SPI042 (DFF)
PL No. 33553373:SUPPLY OF STAINLESS STEEL TUBES WITH STAINLESS STEEL DOUBLE FERRULE FOR LSL
RD COACHES. ITEMS SHOULD BE PACKED IN COACH SETS.Drawing/Specification- ICF SPECIFICATION N
O.-ICF/MD/SPEC-166 ( WITH LATEST REVISION/ AMENDMENTS) AND MATERIAL SCHEDULE AS PER SET
LIST No.-SICTDFFSSPLSLRD. version-03. Packing instruction: SPI042 (DFF)
PL No.33556969:Supply of stainless steel tubes with stainless steel double ferrule fittings & spring pneu
matic control equipment & FIBA piping arrangement for Air spring coaches for LWLRRM coach. as per
Drg.No. As per ICF specification no.-ICF/MD/SPEC-166 ( with latest revision/ amendments) and materia
l schedule ICF/SK-10-2-636, ISSUE STATUS-01, REV.00, CS-01 TO 05and Material schedule ICF/SK-10-2-
637, ISSUE STATUS-01, REV.00, CS-01 for Air spring coaches. As per ICF specification no.-ICF/MD/SPEC
-166 ( wit Spec:As per ICF specification no.-ICF/MD/SPEC-166 ( with latest revision/ amendments) and
material schedule ICF/SK-10-2-636, ISSUE STATUS-01, REV.00, CS-01 TO 05and Material schedule ICF/
SK-10-2-637, ISSUE STATUS-01, REV.00, CS-01 for Air spring coaches. Packing instruction: SPI042 (DFF) |