Broad Head of the Material/Service/Contract | Re-construction, of the (New) Transformer Foundation, for the Augmentation, of the P.T.R. - 1, from the 6.3 M.V.A., to 10 M.V.A., along-with the Construction(s), of the (New) Equipment Foundation(s), for the 33 KV V.C.B. Structure, and the 33 KV C.T. Structure, Construction, of the Cable-Trench, for the Control Cable(s), and the other allied Civil Work(s), within the premise(s), of the Buniadpur 33/11 KV Sub-Station, at Buniadpur, under the Buniadpur (D) Division, in the Dist. Of Dakshin Dinajpur. |