Name of the Work |
Linking of new BG track on PSC wider line sleeper including auxiliary track, TRR by 10/20 rail panel, laying and linking of Points & Xings, SEJs, L-Xings, insertion of pre-assembled turnouts, carriage of material including sleepers & rails, spreading of ballast etc., modification of existing track of station section and all other connected ancillary works as per requirement in between stations Katihar (including) and Mukuria (including) from Ch: Km 0.00 to Km 35.30 in connection with Katihar-Mukuria double line project of N. F. Railway (Construction). |